The Historical Proposal

Proposed Mineral Extraction Areas and Land Requirements during the Quarry Operational Period

Block Phasing Plan

This plan illustrates the proposed limit of mineral extraction and includes the approximate duration of the extraction period/phase.

Not all land is required for mineral extraction at the same time - see drawing opposite.

Quarry Operational Land Requirements

This plan illustrates the actual areas of land that will be required for the quarry plant site and mineral extraction at any one time, during the end of each of the extraction phases.

We will restore the land after each phase of extraction to minimise the amount of land being disturbed at any one time.

The quarry would operate between 7:00am and 19:00pm Monday to Friday, and between 8:00am and 13:30pm on Saturday. No Sunday or Bank Holiday working.

Eight full-time jobs will be created, with a further 20 work opportunities, in connection with transportation and employment of local trades.

HISTORICAL PHASING WORKS

HISTORICAL PHASING WORKS

©Copyright. Lea Castle Quarry. All rights reserved.

We need your consent to load the translations

We use a third-party service to translate the website content that may collect data about your activity. Please review the details in the privacy policy and accept the service to view the translations.